DB2 - Problem description
Problem IC82324 | Status: Closed |
HADR TAKEOVER MAY WAIT UNTIL REORG INDEXES OPERATION WITH "CLEANUP ONLY ALL" OPTION ON PRIMARY IS COMPLETE | |
product: | |
DB2 FOR LUW / DB2FORLUW / 970 - DB2 | |
Problem description: | |
If REORG INDEXES is running with the CLEANUP ONLY ALL option on an HADR primary, then attempts to do a takeover operation on the HADR standby may wait until the operation is complete if the REORG INDEXES operation does not need to do any page merges to cleanup the index. | |
Problem Summary: | |
**************************************************************** * USERS AFFECTED: * * All * **************************************************************** * PROBLEM DESCRIPTION: * * See Error Description * **************************************************************** * RECOMMENDATION: * * Upgrade to DB2 9.7 FP7 or subsequent fix pack. * **************************************************************** | |
Local Fix: | |
Monitor db2 diagnostic log on primary and make sure reorg indexes are complete before issuing HADR takeover operation. You can also use the following db2pd command: db2pd -db <dbName> -reorg index Use -dbpartitionnum option on a DPF environment to look at a partition-level info. | |
available fix packs: | |
DB2 Version 9.7 Fix Pack 7 for Linux, UNIX, and Windows | |
Solution | |
Problem First Fixed in DB2 Version 9.7 Fix Pack 7 | |
Workaround | |
not known / see Local fix | |
BUG-Tracking | |
forerunner : APAR is sysrouted TO one or more of the following: IC88337 follow-up : | |
Timestamps | |
Date - problem reported : Date - problem closed : Date - last modified : | 28.03.2012 05.12.2012 05.12.2012 |
Problem solved at the following versions (IBM BugInfos) | |
9.7.FP7 | |
Problem solved according to the fixlist(s) of the following version(s) | |
9.7.0.7 |